gaara2000 发表于 2013-5-25 10:32 
那我只能说这是中国式的理解方式,如果真照这么做,验证管理规程下面是vmp,验证管理规程里面还有验证sop ...
The VMP should present an overview of the entire validation operation, its organisational structure, its content and planning. The core of the VMP being the list / inventory of the items to be validated and the planning schedule.
A Validation Master Plan is a document that summarises the firm's overall
philosophy, intentions and approach to be used for establishing performance
adequacy.
In case of large projects like the construction of a new facility, often the best approach is to create a separate VMP. (In such situations the VMP should be part of the total project management.)
The VMP should be a summary document and should therefore be brief,
concise and clear. It should not repeat information documented elsewhere but refer to existing documents such as Policy Documents, SOP's and Validation Protocols/Reports.
A VMP should contain data on the following subjects / proposed chapters.
Introduction Firm's validation policy, general description of the scope of those operations covered by the VMP, location and schedule (including priorities). Organisational Structure of All Validation Activities
Personnel responsibility for
- the VMP,
- protocols of individual validation projects,
- - validation work,
- - report and document preparation and control,
- - approval / authorisation of validation protocols and reports in all stages
- of validation processes,
- - tracking system for reference and review,
- - training needs in support of validation.
Plant / Process / Product Description
Provides a cross reference to other documents. A rationale for the inclusion
or exclusion of validations, for the validation approach and the extent of
validation should be included
检查员的理解貌似没有问题啊 |
|