目 录
1.目的Purpose 6
2.范围Scope 6
3.职责Responsibility 6
4.参考文件References 7
5.术语及缩写Terms and Abbreviations 7
6.系统描述System Description 7
7.文件管理规范Documentation Control Procedure 7
8.测试人员确认签名Signature of Test Personnel 9
9.测试所用仪器仪表确认 10
10. 先决条件确认Prerequisites Verification 10
11. 偏差纠正结果及偏差清单 Deviation Correction and List 12
12. FAT总结论 General Conclusion of Factory Acceptance Test 14
13. 测试项目Test Items 15
13.1 文件资料确认Verification of Documentation 15
13.2系统配置确认Verification of System Configuration 16
13.3坡度与隔膜阀安装角度确认Verification of Slope and Diaphragm Valve 17
12.4单控运行测试Single-Control Operation Test 18
12.5密闭性试验确认Verification of Tank Leakage 19
12.6电气安全性测试Electrical Safety Test 20
12.7报警与联锁确认Verification of Alarm and Interlock Test 21
12.8搅拌转速测试Stir Speed Test 22
12.9灭菌/培养程序测试Sterilization/Culture Program Test 23
12.10清洗覆盖面测试 Cleaning Coverage Test 24